Tyler, TX
Home MenuEngineering and Construction Standards
Construction Contract Documents
Design Guidelines
Standard Details
- 3-inch compound meter revised 05-14-21
- adjustments to finished grade revised 05-14-21
- air release assembly revised 05-14-21
- automatic flush valve revised 05-14-21
- bore and encasement revised 05-14-21
- cleanout revised 05-14-21
- concrete encasement revised 05-14-21
- concrete pier revsied 05-14-21
- concrete vault field line revised 05-14-21
- concrete vault revised 05-14-21
- cross section - asphalt street revised 05-14-21
- cross-section - concrete street revised 05-14-21
- curb and gutter revised 05-14-21
- double check detector assembly revised 05-14-21
- driveways and sidewalks revised 05-14-21
- exceptions to txdot specifications revised 05-14-21
- fire hydrant revised 05-14
- general notes - paving and driveways revised 05-14-21
- general notes - storm sewer revised 05-14-21
- pavement repair revised 05-14-21
- public access ramp with curb revised 05-14-21
- public access ramp with flares revised 05-14-21
- sanitary sewer manhole revised 05-14-21
- sewer service installation revised 05-14-21
- step detail revised 05-14-21
- storm sewer area inlet revised 05-14-21
- storm sewer junction box revised 05-14-21
- storm sewer precast manhole revised 05-14-21
- storm sewer recessed inlet revised 05-14-21
- storm sewer standard curb inlet revised 05-14-21
- storm sewer y-inlet revised 05-14-21
- testing requirements for paving revised 05-14-21
- thrust blocking revised 05-14-21
- trench detail - dip revised 05-14-21
- trench detail - hdpe revised 05-14-21
- trench detail - pvc revised 05-14-21
- underdrain revised 05-14-21
- valley gutter and concrete header revised 05-14-21
- water service installation revised 05-14-21